Request a Quote

Four steps from first message to handover.

You deal with the owners at every step. There is no agent in between.

  1. Tell us what you need

    Send what you make, the area you need and the power your line draws.

  2. Get the fact sheet

    We send the factory fact sheet and the site plan.

  3. Visit the site

    Walk both buildings in New Borg El Arab. Visits are by appointment.

  4. Agree and take over

    Area, term and handover are agreed directly with the family.

What is on site

  • Registered land of 10,000 m²
  • Steel building, 16 m high at the centre and 11 m at the walls
  • Mezzanine of 800 m² inside the steel building
  • Concrete building with two floors of 2,400 m², each 5 m high
  • Two 380 V electrical rooms: 1 MW and 1.5 MW
  • Steam boiler fired by natural gas
  • Water line, sewage network and rainwater drainage
  • Civil-defence fire network across the site
  • Administration building on three floors

Terms

  • RentOn request
  • Lease termAgreed with the family
  • Areas availableConfirmed when you enquire

Talk to the owners

Ask for the fact sheet, or book a visit.

Tell us what you make and the area you need. Rent, term and available areas are agreed directly with the family.

Visits to the site are by appointment.